DG/DGH/DGB Fire Wall Hangers

DG/DGH/DGB

Fire Wall Hangers for Glulam Beams

This product's information may differ depending on the category of use. You are currently viewing details related to Fire Wall Hangers for Glulam Beams. You can also view product information related to the categories of: Fire Wall Hangers for Plated Truss, Fire Wall Hangers for Solid Sawn Lumber, Fire Wall Hangers for Engineered Wood

The new DG fire wall hangers easily install on a two-hour wood stud fire wall (e.g. Type III construction) during framing. These top-flange hangers feature space to allow two layers of 5/8" gypsum wall board (drywall) to be slipped into place after the framing is complete. The DG/DGH/DGB fire-rated wall hangers have been tested according to ASTM E814 and received F (Flame) and T (temperature) ratings for use on one or both sides of the wall in Intertek Design No. SST/WPCF 120-01. This rating verifies that the DG/DGH/DGB hangers do not reduce the two-hour, fire wall assembly rating. The rating applies to both 2x4 and 2x6 walls.

All models of the DGH hanger may be ordered with a skew angle of up to 45° or with the top flange offset left or right.

Material

  • DG — 12 ga.; DGH — 10 ga.; DGB — 7 ga.

Finish

  • DG — G90; DGH and DGB Simpson Strong-Tie gray paint

Related Literature

Load Tables

Model Ga. Depth Fasteners DF/SP SPF/HF
Top Face Joist Uplift (160) Download (100/125) Uplift (160) Download (100/125)
DG 12 7 1/4 to 11 1/4 (6) 10d - (6) 10d x 1 1/2" 315 1,535 245 1,395
DG 12 11 7/8 to 24 (6) 10d - (6) 10d x 1 1/2" 315 1,680 245 1,525
DGH 10 9 1/2 to 24 (5) 10d (2) 10d (8) 10d x 1 1/2" 900 2,305 615 1,910
DGB
(over stud)
7 9 1/2 to 24 (8) 10d (4) 10d (8) 10d 975 3,015 740 2,280
  1. Uplift loads have been increased for wind or seismic loading with no further increase allowed. Reduce where other loads govern.
  2. Allowable loads are for 2x4 minimum stud wall. Back-to-back installations require a minimum 2x6 wall. Wall design by Designer.
  3. Loads are based on a joist spacing of 16" o.c. or greater. Allowable loads for joists spaced less than 16" o.c. shall be reduced proportionally.
  4. DGB installation requires a minimum (2) 2x4 stud or post in the wall at hanger location. Post design by Designer.
  5. Nails: 10d = 0.148" dia. x 3" long, 10d x 1 1/2" = 0.148" dia. x 1 1/2" long.
Allowable Loads for DGH Hanger Options
Model Ga. Fasteners DF/SP Allowable Loads SPF/HF Allowable Loads
Top Face Joist Uplift (160) Download (100/115/125) Uplift (160) Download (100/115/125)
DGH (skewed) 10 (5) 10d (2) 10d (8) 10d x 1 1/2" 315 1,620 245 1,350
DGH (offset) 10 (5) 10d (2) 10d 4 (8) 10d x 1 1/2" 870 2,010 755 1,705
  1. Uplift loads have been increased for wind or seismic loading with no further increase allowed. Reduce where other loads govern.
  2. Hangers may be skewed up to 45°
  3. Allowable loads are for 2x4 minimum stud wall. Back-to-back installations require a minimum 2x6 wall. Wall design by Designer.
  4. Face nails for DGH (offset) may be installed in any two holes.
  5. Loads are based on a joist spacing of 16" o.c. or greater. Allowable loads for joists spaced less than 16" o.c. shall be reduced proportionally.
  6. Skew and offset options may not be combined.
  7. Nails: 10d = 0.148" dia. x 3" long, 10d x 1 1/2" = 0.148" dia. x 1 1/2" long.