We use cookies on this site to enhance your user experience. By clicking "I AGREE" below, you are giving your consent for us to set cookies. Privacy Policy

text.skipToContent text.skipToNavigation

MMLU Face-Mount Hanger for Factory-Built Structures

MMLU

On This Page

The face-mount MMLU series provides installation versatility for factory-built structures. Nailing grids in the MMLU hangers replace traditional nail holes, allowing for faster installation of power-driven nails. Each hanger provides multiple nailing pattern options to enable value engineering for different loads.

Key Features

  • Versatile fastener placement enables faster installation, ideal for modular building settings
  • Designed with factory-used tools in mind
  • Built specifically for optimal fastening using a power nailer

Material

  • MMLU26-2, MMLU28-2 —18 gauge, all others — 20 gauge

Finish

  • Galvanized

Installation

  • Nails must be installed with a powered nail tool. Face protection is required. To reduce ricochet, install nails straight through the nailing grid. Follow all safety instructions for the nail tool.
  • Adjust the nail tool pressure so nail heads are flush with the hanger and are not overdriven causing the MMLU steel to dimple.
  • Install at least one 8d x 1 1/2" or 10d x 1 1/2" nail into each nailing grid.
  • Install additional nails in accordance with the MMLU Installation and Load Table for increased capacity. Each header nailing grid must contain the same quantity of nails.
  • The minimum vertical center-to-center spacing of nails in the same nailing grid is 1/2" and must not split the wood header.
  • The MMLU height (H) must equal or exceed 60% of the joist height to provide joist rotation resistance. If H is less than 60% of the joist height, provide lateral restraint to the top of the joist by other means, such as blocking, end nailing or Simpson Strong-Tie® A34 framing angles above the hanger.
  • I-joist web stiffeners or floor truss end vertical webs must be installed in the carried member when the hanger side flanges do not support the I-joist top flange or floor truss top chord.

Related Literature

Load Tables

MMLU Installation and Load Table
MMLU Installation and Load Table
  1. Connectors must be installed with 8d x 1 1/2" (0.131" x 1 1/2") or 10d x 1 1/2" (0.148" x 1 1/2") nails.
  2. Loads apply to DF, SP, HF and SPF lumber species.
  3. Tabulated values are based on a load duration factor (CD) of 1.0 with no further increase allowed.
  4. Install two nails in the optional triangle holes for an increased allowable uplift load of 330 lb. (CD = 1.0) or 445 lb. (CD = 1.6) for the MMLUI211, MMLUI39 and MMLUI311.

Code Reports & Compliance

Drawings

PDF DWG DXF RFA IFC SAT